A data-driven method for estimating M365 migration duration and throughput, grounded in Microsoft's real throttling behavior and pilot measurements.
"How long will it take?" is the first question every stakeholder asks and the one teams most often answer wrong. The honest answer comes from data: total volume, real per-mailbox throughput, and Microsoft's throttling ceiling — validated against a measured pilot. This guide replaces the optimistic guess with a defensible estimate, and explains the throttling behavior that makes raw GB-per-hour math misleading.
The tempting calculation is "total GB ÷ network speed = duration." It's wrong because the binding constraint in M365 migrations is almost never network bandwidth — it's service-side throttling. Microsoft deliberately rate-limits migration traffic per tenant and per migration endpoint to protect the service. You can have a 10 Gbps pipe and still be capped at a few hundred GB per hour because EWS or the Graph throttles your service account. Estimating from bandwidth produces numbers that are off by an order of magnitude.
Is it really free?
Yes — completely. No trial, no card, no catch. Enter your email and the full guide opens instantly.
Will you spam me?
No. We'll email your copy and, only if you opt in, the occasional genuinely useful migration tip. One click unsubscribes you for good.
Can I share it with my team?
Please do. Forward the PDF or send them the link — every teammate can grab their own copy.